Currently reading:
What we all working on this week ?

Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,158
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 116
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Kitchen sink swap today it was a total pig to do, getting it out was the easy bit the worktop needed cutting out bigger and the cabinets needed trimming out, i did like the way the tap fixed to the sink looked tidy once compleate. Kop

Doing an outside tap this morning and asked me to tighten the tap whilst there. Same type of fitting. Hadnt seen one before.
 
Fml joiner who can’t build a square wall it’s out 4” cross and 11/2” in 800mm (width of the tray)
 

Attachments

  • 3C3C700A-ACC7-4576-A424-4666764B1F92.jpeg
    3C3C700A-ACC7-4576-A424-4666764B1F92.jpeg
    104.1 KB · Views: 15
  • 678CE0C9-7C14-48A7-BC28-E4C8FF3D609A.jpeg
    678CE0C9-7C14-48A7-BC28-E4C8FF3D609A.jpeg
    98.8 KB · Views: 19
Get out of it. You cut your board wonky;);)

:D hope not traced round the shower tray, knowing my luck lately your prob right
[automerge]1601394168[/automerge]
The floors sloping all directions so took some time but it’s level and solid

what’s the chances of it getting covered in plaster you think :D
 

Attachments

  • 34A9A758-DDE4-46AD-9CAD-E1BB65F1AE9B.jpeg
    34A9A758-DDE4-46AD-9CAD-E1BB65F1AE9B.jpeg
    161.2 KB · Views: 11
  • BA2F15CB-64E4-4FD4-8320-6BA4CD45D0AC.jpeg
    BA2F15CB-64E4-4FD4-8320-6BA4CD45D0AC.jpeg
    147.7 KB · Views: 12
  • CF477806-6C8D-4FB0-97E6-A61762936246.jpeg
    CF477806-6C8D-4FB0-97E6-A61762936246.jpeg
    144.8 KB · Views: 16
Last edited:
It’s looking sharp Simon, is a kind of mixer tap/watering can?

I took hot and cold through double check valves behind barrel, up through the 15mm gate valves for hot and cold taps and then t'd together in wall. 15mm comes out through bottom of watering can and then reduces to 10mm which I managed to direct down through the spout.
 
Nice one! 👍
Bit more interesting to do than the usual, hard to price that sort of thing though, but I’m guessing an existing customer so do job then send bill?

No new customer. Estimated day and half plus materials. Came in slightly under estimate. Customer pleased and already have to go and look at a couple of bathrooms through her recommendation.
 
Ooo slight criticism you can’t use them nrv on the blow off there only rated for gravity eg overflows and not temp or pressure
 
Fml joiner who can’t build a square wall it’s out 4” cross and 11/2” in 800mm (width of the tray)

That looks fun o_O

Had the joys of installing a corner basin on job I was on last week on a similarly square wall. Also had to re do the walls where the shower is going as he used cement board off cuts pieced together like a blimin jigsaw puzzle with plenty of huge gaps.
 
That looks fun o_O

Had the joys of installing a corner basin on job I was on last week on a similarly square wall. Also had to re do the walls where the shower is going as he used cement board off cuts pieced together like a blimin jigsaw puzzle with plenty of huge gaps.

bet he said it would be fine :d
 

Attachments

  • Screenshot_20200930-201717.png
    Screenshot_20200930-201717.png
    257.4 KB · Views: 25
  • IMG_20200824_122425.jpg
    IMG_20200824_122425.jpg
    114.5 KB · Views: 24
  • IMG_20201001_121236.jpg
    IMG_20201001_121236.jpg
    95.7 KB · Views: 22
Last edited:
Sometimes you wish you hadn’t gotten out of bed :D

old Worcester’s 2008 never been serviced and then the electrodes Screws strip the threads so you have to make them an m6
 

Attachments

  • D6011C80-23E3-40BC-B9BE-7ED6383C920E.jpeg
    D6011C80-23E3-40BC-B9BE-7ED6383C920E.jpeg
    112.3 KB · Views: 17
Yep me too. Re piping bath and basin. Took the old out just before having my egg and mayonnaise sarnie. Bleeaaargh.
[automerge]1602073846[/automerge]
Ooops forgot to add the photos!
 

Attachments

  • 16020738155847150631296823906167.jpg
    16020738155847150631296823906167.jpg
    128.6 KB · Views: 17
  • 16020738327701981996636385824729.jpg
    16020738327701981996636385824729.jpg
    104 KB · Views: 18
I have just tried to change a Trv on a rad and couldn’t get the new tail in, as the old one had been cross threaded. New rad it is then.

day for bad threads :D
 
Did you have he tools and bolts on your van?

bolts yes tap and die set no but it’s staying on the van now took around an hour had it in the workshop
 

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top